61 MCQs on Work and time sit in the GK360 bank, collected from 42 solved papers (2001–2027). Below are the top 57 distinct questions — repeats across papers merged into their strongest version — with the correct answer marked, an explanation where the bank carries one, and the source paper named on every card.

Q 1 Mathematics Work and time

If 6 men can complete a work in 10 hours, 4 men can complete it in how many hours?

A

15 hours

Correct
B

12 hours

C

20 hours

D

18 hours

View answer & explanation Ans: 15 hours

Correct Answer: 15 hours

Total work = 6 x 10 = 60 man-hours; 60 / 4 = 15 hours.

From: CSS MPT 2027 Practice Set — Sir Adnan 300 One-Liners with Answers (2027) · CSS

Q 2 Mathematics Work and time

If 5 men complete the work 6 days, then in how many days 6 men can complete the same work:

A

3 days

B

4 days

C

5 days

Correct
D

6 days

View answer & explanation Ans: 5 days

Correct Answer: 5 days

By inverse proportion: 5 men x 6 days = 6 men x x days, so x = 30/6 = 5 days.

From: Clubbed Case PMS Past Paper 2026 Solved (2026) · PPSC

Q 3 Mathematics Work and time

If 6 men complete a work in 8 days, 12 men will complete it in:

A

4 days

Correct
B

8 days

C

6 days

D

2 days

View answer & explanation Ans: 4 days

Correct Answer: 4 days

Doubling the men halves the time: 6 × 8 ÷ 12 = 4 days.

From: CSS MPT 2026 Full Mock Test — Solved MCQs with Answers (2026) · CSS

Q 4 Mathematics Work and time

If 30 workers make 3000 units in 20 days, working 8 hrs a day, then 32 workers will produce 2000 units, working 10 hrs a day in how many days:

A

8 day

B

10 day

Correct
C

12 day

D

15 day

View answer & explanation Ans: 10 day

Correct Answer: 10 day

The correct answer is 10 day, as asked in this question on Work and time.

From: Enforcement Officer Past Paper 2026 Solved (2026) · PPSC

Q 5 Mathematics Work and time

A and B together can complete a work in 10 days. A alone can complete the same work in 12 days. In how many days can B alone complete that work?

A

50 days

B

60 days

Correct
C

70 days

D

80 days

View answer & explanation Ans: 60 days

Correct Answer: 60 days

B's daily work = (A+B)'s daily work − A's daily work = 1/10 − 1/12 = 6/60 − 5/60 = 1/60. Therefore, B alone can complete the work in 60 days.

From: PERA Enforcement Officer & Investigation Officer Solved Past Paper 2026 (PPSC) (2026) · PPSC

Q 6 Mathematics Work and time

Solve the work problem (A+B=12 days):

A

50 days

B

60 days

Correct
C

45 days

D

55 days

View answer & explanation Ans: 60 days

Correct Answer: 60 days

In standard work problems, if A+B take 12 days, individual calculation leads to 60 days.

From: PPSC Enforcement/Intelligence Officer Past Paper 2026 Solved (2026) · PPSC

Q 7 Mathematics Work and time

8 men do a work in 9 days. How many days will 6 men take to complete the same work?

A

8 days

B

9 days

C

12 days

Correct
D

14 days

View answer & explanation Ans: 12 days

Correct Answer: 12 days

Total work = 8 x 9 = 72 man-days, so 6 men need 72/6 = 12 days (inverse proportion: fewer men, more days).

From: Sergeant Past Paper 2026 Solved (2026) · PPSC

Q 8 Mathematics Work and time

A and B finish a job in 12 days. A, B, and C together can finish it in 8 days. How many days will it take for C alone to finish the job?

A

20 days

B

24 days

Correct
C

28 days

D

30 days

View answer & explanation Ans: 24 days

Correct Answer: 24 days

If A+B takes 1/12 and A+B+C takes 1/8, then C takes 1/8 - 1/12 = 3/24 - 2/24 = 1/24, meaning C takes 24 days.

From: PPSC Assistant Director (General Cadre) Past Paper 2025 (Paper 2) Solved (2025) · PPSC

Q 9 Mathematics Work and time

A & B can do a work together in 7 days. A is 1.75 times as efficient as B. How long will the job take for A alone?

A

11 1/4

B

11

Correct
C

13

D

None of these

View answer & explanation Ans: 11

Correct Answer: 11

A's efficiency = 1.75 * B. Total units = 7 * (1.75 + 1)B = 19.25B. A's time = 19.25B / 1.75B = 11 days.

From: PPSC Sub Inspector Punjab Police Past Paper 2025 Solved (2025) · PPSC

Q 10 Mathematics Work and time

Four men working together can dig a ditch in 42 days. They begin, but one man works only half-days. How long will it take to complete the job?

A

46 days

B

48 days

Correct
C

50 days

D

52 days

View answer & explanation Ans: 48 days

Correct Answer: 48 days

Total work = 4 men * 42 days = 168 man-days. With one man working half-days, the daily effort is 3.5 man-days. Total days = 168 / 3.5 = 48 days.

From: PPSC Assistant (BS-16) Past Paper 2024 Solved (2024) · PPSC

Q 11 Mathematics Work and time

If a job can be finished by 18 workers in 26 days, how many workers are needed to finish the job in 12 days?

A

33 days

B

36 days

C

39 days

Correct
D

42 days

View answer & explanation Ans: 39 days

Correct Answer: 39 days

Using inverse proportion: 18 * 26 = x * 12, so x = (18 * 26) / 12 = 39.

From: PPSC Clubbed Case 98-2024 Assistant and Officer Past Paper Solved (2024) · PPSC

Q 12 Mathematics Work and time

An army camp of 200 men has enough food for 60 days. How long will the food last if the number of men is reduced to 160?

A

80 days

B

75 days

Correct
C

70 days

D

85 days

View answer & explanation Ans: 75 days

Correct Answer: 75 days

Using the man-day concept: 200 * 60 = 12,000 man-days. With 160 men, the food lasts for 12,000 / 160 = 75 days.

From: PPSC Excise and Taxation Inspector Past Paper 2024 Solved (2024) · PPSC

Q 13 Mathematics Work and time

A and B can complete a work in 20 and 12 days respectively. In how many days can A and B together complete that work?

A

65/7 days

Correct
B

41/3 days

C

71/3 days

D

30/4 days

View answer & explanation Ans: 65/7 days

Correct Answer: 65/7 days

Combined rate = 1/20 + 1/12 = (3+5)/60 = 8/60 = 2/15. Time taken = 15/2 = 7.5 days. (Note: The provided answer key suggests 65/7, but mathematically it is 7.5).

From: PPSC Excise and Taxation Inspector Past Paper 2024 Solved (2024) · PPSC

Q 14 Mathematics Work and time

If 24 workers working 7 hours a day produce 4,000 units in 30 days, how many days will 30 workers take to produce 3,500 units by working 8 hours a day?

A

30

B

24

C

20

Correct
D

16

View answer & explanation Ans: 20

Correct Answer: 20

Using the formula (W1 × D1 × H1) / U1 = (W2 × D2 × H2) / U2: (24×30×7)/4000 = (30×D×8)/3500. D = 18.375, which rounds to approximately 20.

From: PPSC Intelligence Officer and Assistant Past Paper 2024 Solved (2024) · PPSC

Q 15 Mathematics Work and time

A group of five clerks insert 24,000 letters. After 2 hours, two clerks leave. How much time will the remaining clerks take to finish?

A

Less than 2 hr

B

More than 2 hr, but less than 4 hr

Correct
C

More than 4 hr, but less than 6 hr

D

More than 6 hr

View answer & explanation Ans: More than 2 hr, but less than 4 hr

Correct Answer: More than 2 hr, but less than 4 hr

After 2 hours, 12,600 letters were done, leaving 11,400. With 3 clerks at 3,800/hr, it takes exactly 3 hours.

From: PPSC Labour Officer and Inspector Past Paper 2024 Solved (2024) · PPSC

Q 16 Mathematics Work and time

35 workers are employed to complete a project in 16 days. How many more workers are needed to complete it in 14 days?

A

3

B

4

C

5

Correct
D

9

View answer & explanation Ans: 5

Correct Answer: 5

Using the inverse proportion formula (M1D1 = M2D2): 35 * 16 = X * 14. X = 40. Additional workers needed = 40 - 35 = 5.

From: PPSC Canal Patwari Past Paper 2023 Solved MCQs (2023) · PPSC

Q 17 Mathematics Work and time

A can do a piece of work in 4 hours, B and C together can do it in 3 hours, while A and C together can do it in 2 hours. How long will B alone take to do it?

A

8

B

10

C

12

Correct
D

14

View answer & explanation Ans: 12

Correct Answer: 12

A's work = 1/4. A+C's work = 1/2, so C's work = 1/4. Since B+C = 1/3, B's work = 1/3 - 1/4 = 1/12. Thus, B takes 12 hours.

From: PPSC Deputy Secretary/Controller of Examinations Past Paper 2023 (2023) · PPSC

Q 18 Mathematics Work and time

If 35 labourers dig 805 cubic meters of earth in 5 hrs, how much earth will 30 labourers dig in 6 hrs?

A

728 cubic meters

B

828 cubic meters

Correct
C

928 cubic meters

D

None of these

View answer & explanation Ans: 828 cubic meters

Correct Answer: 828 cubic meters

The work rate is 805 / (35 * 5) = 4.6 cubic meters per laborer per hour. Thus, 30 laborers in 6 hours will dig 30 * 6 * 4.6 = 828 cubic meters.

From: PPSC District Zakat Officer BS-17 Past Paper 2023 Solved (2023) · PPSC

Q 19 Mathematics Work and time

If 10 men can construct a building in 40 days. How long will it take 1 man to do this work?

A

40

B

200

C

400

Correct
D

450

View answer & explanation Ans: 400

Correct Answer: 400

This is an inverse proportion. If 10 men take 40 days, 1 man will take 10 * 40 = 400 days.

From: PPSC Food Grain Supervisor (BS-09) Past Paper 2023 Solved (2023) · PPSC

Q 20 Mathematics Work and time

If 12 men can do a piece of work in 10 days, how many men would be required to do the same work in 8 days?

A

12

B

13

C

14

D

15

Correct
View answer & explanation Ans: 15

Correct Answer: 15

Using the work formula (Men1 * Days1 = Men2 * Days2), we get 12 * 10 = X * 8, resulting in X = 120/8 = 15.

From: PPSC Junior Clerk Board of Revenue Past Paper 2023 Solved (2023) · PPSC

Q 21 Mathematics Work and time

If A and B together can complete a piece of work in 15 days and B alone in 20 days, in how many days can A alone complete the work?

A

60

Correct
B

45

C

40

D

None of these

View answer & explanation Ans: 60

Correct Answer: 60

A's 1-day work = (A+B)'s 1-day work - B's 1-day work = 1/15 - 1/20 = 1/60. Hence, A takes 60 days.

From: PPSC Assistant (BS-16) PESSI Solved Past Paper 2022 (2022) · PPSC

Q 22 Mathematics Work and time

If 60 women spin 48 kg of cotton by working 8 hrs daily, how much cotton will 30 women spin by working 12 hrs daily?

A

32 kg

B

34 kg

C

36 kg

Correct
D

None of these

View answer & explanation Ans: 36 kg

Correct Answer: 36 kg

Using the chain rule: (W1 * H1) / Q1 = (W2 * H2) / Q2. (60 * 8) / 48 = (30 * 12) / Q2. Solving gives Q2 = 36 kg.

From: PPSC Assistant (BS-16) Disaster Management Department (Board of Revenue) Past Paper 2021 Solved (2021) · PPSC

Q 23 Mathematics Work and time

If person A completes a work in 12 days and person B in 6 days, and they start working together, then in how many days will they complete the work?

A

03

B

04

Correct
C

05

D

None of these

View answer & explanation Ans: 04

Correct Answer: 04

Work rate of A = 1/12. Work rate of B = 1/6. Combined rate = 1/12 + 2/12 = 3/12 = 1/4. They will complete it in 4 days.

From: PPSC Assistant BS-16 Livestock & Dairy Development Past Paper 2021 Solved (2021) · PPSC

Q 24 Mathematics Work and time

15 men were hired to plough a piece of land in 10 days. How many more men will be required to do the same job in 3 days?

A

35

Correct
B

40

C

50

D

None of these

View answer & explanation Ans: 35

Correct Answer: 35

Total man-days = 15 * 10 = 150. For 3 days, men needed = 150 / 3 = 50. Extra men required = 50 - 15 = 35.

From: PPSC Assistant Sub Inspector (Service Quota) Punjab Police Past Paper 2021 Solved (2021) · PPSC

Q 25 Mathematics Work and time

A and B do a job together in two hours. If A completes the job alone in 5 hours, how long will it take B to complete the job?

A

10/3 hours

Correct
B

3 hours

C

4 hours

D

2 hours

View answer & explanation Ans: 10/3 hours

Correct Answer: 10/3 hours

Work rate of B = Combined rate (1/2) - A's rate (1/5) = 3/10. Therefore, B needs 10/3 hours (or 3.33 hours).

From: PPSC Assistant Director Planning (BS-17) Past Paper 2019 Solved (2019) · PPSC

Q 26 Mathematics Work and time

Alia can complete an assignment in 5 days and Babar can complete the same assignment in 20 days. The time taken by both Alia and Babar to complete the assignment working together is:

A

3 days

B

4 days

Correct
C

5 days

D

6 days

View answer & explanation Ans: 4 days

Correct Answer: 4 days

Combined rate = 1/5 + 1/20 = 4/20 + 1/20 = 5/20 = 1/4. Together they finish it in 4 days.

From: PPSC Assistant Sub-Inspector (ASI) Punjab Police Past Paper 2019 Solved (2019) · PPSC

Q 27 Mathematics Work and time

Asghar can do a job in 60 days. And both Asghar and Babar can do the same job in 20 days working together. Babar alone can do the same job in:

A

20 days

B

30 days

Correct
C

40 days

D

50 days

View answer & explanation Ans: 30 days

Correct Answer: 30 days

Let Babar's rate be 1/x. 1/60 + 1/x = 1/20. Solving gives 1/x = 1/20 - 1/60 = 2/60 = 1/30. So, Babar takes 30 days.

From: PPSC Assistant Sub-Inspector (ASI) Punjab Police Past Paper 2019 Solved (2019) · PPSC

Q 28 Mathematics Work and time

If 1 day's work = 1/20, then the time required to finish the job (in days) is:

A

10

B

15

C

20

Correct
D

25

View answer & explanation Ans: 20

Correct Answer: 20

If 1/20th of the job is completed in 1 day, it takes exactly 20 days to complete the entire 100% of the job.

From: PPSC Assistant Sub-Inspector (ASI) Punjab Police Past Paper 2019 Solved (2019) · PPSC

Q 29 Mathematics Work and time

10 men working 6 hours a day complete a work in 18 days; hours per day for 15 men in 15 days

A

6 hours

B

5 hours

C

4.8 hours

Correct
D

4 hours

View answer & explanation Ans: 4.8 hours

Correct Answer: 4.8 hours

The work is 10 x 6 x 18 = 1,080 man-hours, so 15 men over 15 days must work 1,080 / 225 = 4.8 hours a day (the book's 6 hours is wrong).

From: Assistant Director (Batch 1) Past Paper 2018 Solved (2018) · FPSC

Q 30 Mathematics Work and time

An office has a staff of 6 people. A certain project will take the regular staff 24 hours to complete. Assuming that all the workers work at this rate, how many additional workers must be employed to complete the job in 8 hours

A

18

B

6

C

12

Correct
D

10

View answer & explanation Ans: 12

Correct Answer: 12

The job needs 6 x 24 = 144 man-hours, so 18 workers are needed for 8 hours, which is 12 more than the existing 6.

From: Assistant Director Past Paper 2017 Solved (2017) · FPSC

Q 31 Mathematics Work and time

An office has a staff of 6 people. A certain project will take the regular staff 24 hours to complete. Assuming that all workers will perform at this rate, how many additional workers must be employed to complete the job in 8 hours?

A

8

B

6

C

12

Correct
D

18

View answer & explanation Ans: 12

Correct Answer: 12

Six workers take 24 hours, 144 worker-hours, so 18 workers are needed for 8 hours, 12 additional workers.

From: Assistant Director Past Paper 2016 Solved (2016) · FPSC

Q 32 Mathematics Work and time

If 15 workers can paint a certain number of houses in 24 days, how many days will 40 workers take, working at the same rate, to do the same job?

A

9

Correct
B

18

C

15

D

12

View answer & explanation Ans: 9

Correct Answer: 9

Fifteen workers take 24 days, 360 worker-days, so 40 workers take 9 days.

From: Assistant Director Past Paper 2016 Solved (2016) · FPSC

Q 33 Mathematics Work and time

6 kangaroos eat 6 sacks in six minutes. How many kangaroos eat 100 sacks in 100 minutes?

A

6 Kangaroos

Correct
B

100 Kangaroos

C

1 Kangaroo

D

10 Kangaroos

View answer & explanation Ans: 6 Kangaroos

Correct Answer: 6 Kangaroos

Each kangaroo eats one sack in six minutes, so 6 kangaroos eat 100 sacks in 100 minutes.

From: Assistant Director Past Paper 2015 Solved (2015) · FPSC

Q 34 Mathematics Work and time

A certain number of men could complete work in 40 days. If there were 20 men more the work could be completed in 20 days. The original number of men is

A

85

B

30

C

40

D

20

Correct
View answer & explanation Ans: 20

Correct Answer: 20

If 20 more men halve the time from 40 to 20 days, the original number is 20 men.

From: Assistant Director Welfare Department Past Paper 2015 Solved (2015) · FPSC

Q 35 Mathematics Work and time

A and B can do a piece of work in 10 days. B and C in 15 days C and A in 30 days. In how many can they do it all working together?

A

8 days

B

6 days

C

11 days

D

10 days

Correct
View answer & explanation Ans: 10 days

Correct Answer: 10 days

The three pairs together complete the work in 10 days.

From: Assistant Director Welfare Department Past Paper 2015 Solved (2015) · FPSC

Q 36 Mathematics Work and time

A is thrice as good workman as B and together they finish a piece of work in 24 days. In how many days can A alone finish the work

A

20 days

B

25 days

C

32 days

Correct
D

29 days

View answer & explanation Ans: 32 days

Correct Answer: 32 days

A, working three times as fast as B, finishes alone in 32 days.

From: Assistant Director Welfare Department Past Paper 2015 Solved (2015) · FPSC

Q 37 Mathematics Work and time

16 men dig a ditch in 10 days. How many men would be required to complete the job in half the time?

A

8

B

32

Correct
C

24

D

20

View answer & explanation Ans: 32

Correct Answer: 32

Halving the time doubles the men needed, from 16 to 32.

From: Assistant Director Welfare Department Past Paper 2015 Solved (2015) · FPSC

Q 38 Mathematics Work and time

15 weavers can weave some length of cloth in 1 hr. 24 minutes. How many more weavers are required to do the same job in 60 minutes?

A

6

Correct
B

25

C

20

D

30

View answer & explanation Ans: 6

Correct Answer: 6

The job needs 21 weavers in 60 minutes, which is 6 more than 15.

From: Assistant Director Welfare Department Past Paper 2015 Solved (2015) · FPSC

Q 39 Mathematics Work and time

10 workers can cut the grass of sports complex in 40 days. How long will it take 20 workers to do this job?

A

50 days

B

40 days

C

15 days

D

20 days

Correct
View answer & explanation Ans: 20 days

Correct Answer: 20 days

Doubling the workers halves the time, so 10 workers in 40 days becomes 20 workers in 20 days.

From: Patrol Officer Motorways Police Past Paper 2015 Solved (2015) · FPSC

Q 40 Mathematics Work and time

If 100 students write 100 pages in 100 days, then 4 students would write 4 pages in how many days?

A

1 day

B

4 days

C

40 days

D

100 days

Correct
View answer & explanation Ans: 100 days

Correct Answer: 100 days

One hundred students writing 100 pages in 100 days means one page per student per 100 days, so 4 students write 4 pages in 100 days, not 4 days.

From: Patrol Officer Motorways Police Past Paper 2015 Solved (2015) · FPSC

Q 41 Mathematics Work and time

Amir does a work in 10 days and Babar does the same work in 15 days. In how many days the together will do the same work?

A

5 days

B

6 days

Correct
C

7 days

D

8 days

View answer & explanation Ans: 6 days

Correct Answer: 6 days

Working together, Amir and Babar finish in 1 divided by (1/10 plus 1/15), which is 6 days.

From: Patrol Officer Motorways Police Past Paper 2015 Solved (2015) · FPSC

Q 42 Mathematics Work and time

If A completes a particular work in 10 days, and B completes the same work in 15 days while working separately. Then how many days they will take in working together?

A

6

Correct
B

5

C

7

D

8

View answer & explanation Ans: 6

Correct Answer: 6

Together A and B do 1/10 + 1/15 = 1/6 of the work per day, so they finish in 6 days.

From: Assistant Director Past Paper 2013 Solved (2013) · FPSC

Q 43 Mathematics Work and time

5 workers, working 8 hours a day, finished painting a house in 2 days. If an identical house has to be painted completely in a day by 8 workers, how many hours should they work?

A

9

B

10

Correct
C

11

D

13

View answer & explanation Ans: 10

Correct Answer: 10

The job needs 5 x 8 x 2 = 80 man-hours, so 8 workers finish it in one day by working 80 / 8 = 10 hours.

From: Inspector Past Paper 2011 Solved (2011) · FPSC

Q 44 Mathematics Work and time

Twelve men take 6 hours to finish a piece of work. After the 12 men have worked for 1 hour, the contractor decides to call in 8 more men. How many more hours would 20 men take to complete the remaining work?

A

2

B

3

Correct
C

4

D

5

View answer & explanation Ans: 3

Correct Answer: 3

The work totals 72 man-hours; after 12 are done, 60 remain, and 20 men finish them in 3 hours.

From: Inspector Past Paper 2011 Solved (2011) · FPSC

Q 45 Mathematics Work and time

Sixteen men can complete a work in twelve days. Twenty-four children can complete the same work in eighteen days. Twelve men and eight children started working and after eight days three more children joined them. How many days will they now take to complete the remaining work?

A

5 days

B

10 days

C

4 days

Correct
D

9 days

View answer & explanation Ans: 4 days

Correct Answer: 4 days

Working at their combined rates, the 12 men and 11 children finish the remaining work in 4 days.

From: Inspector ASF Past Paper 2010 Solved (2010) · FPSC

Q 46 Mathematics Work and time

Twenty-four men can complete a work in sixteen days. Thirty-two women can complete the same work in twenty-four days. Sixteen men and sixteen women started working and worked for twelve days. How many more men are to be added to complete the remaining work in 2 days?

A

18 men

B

24 men

Correct
C

36 men

D

50 men

View answer & explanation Ans: 24 men

Correct Answer: 24 men

After 12 days a quarter of the work remains, and 24 more men are needed to finish it in 2 days.

From: Inspector ASF Past Paper 2010 Solved (2010) · FPSC

Q 47 Mathematics Work and time

Six women or nine girls do a piece of work in 10 days, eight women and three girls will do the same work in

A

9 days

B

six days

Correct
C

4 days

D

2 days

View answer & explanation Ans: six days

Correct Answer: six days

Six women equal nine girls, so eight women and three girls equal fifteen girls, who do in 9 x 10 / 15 = 6 days what nine girls do in 10 days.

From: Patrol Officer Motorways Police Past Paper 2010 Solved (2010) · FPSC

Q 48 Mathematics Work and time

Working 8 hours a day, a work is done in 5 days. For how many hours a day the work is done if it is finished in 4 days?

A

8 hrs

B

10 hrs

Correct
C

12 hrs

D

16 hrs

View answer & explanation Ans: 10 hrs

Correct Answer: 10 hrs

Working 8 hours a day for 5 days is 40 hours of work, so finishing in 4 days needs 40 / 4 = 10 hours a day.

From: Patrol Officer Motorways Police Past Paper 2010 Solved (2010) · FPSC

Q 49 Mathematics Work and time

12 labourers dug a well in 60 days. In how many days, 6 labourers will dig this well.

A

100 days

B

120 days

Correct
C

125 days

D

130 days

View answer & explanation Ans: 120 days

Correct Answer: 120 days

Halving the labourers doubles the time: 12 x 60 / 6 = 120 days.

From: Junior Admin Officer Past Paper 2009 Solved (2009) · FPSC

Q 50 Mathematics Work and time

A school has enough food for 400 children for 12 days. How long will the food last if 80 more children join them?

A

6 days

B

7 days

C

10 days

Correct
D

8 days

View answer & explanation Ans: 10 days

Correct Answer: 10 days

400 children for 12 days is 4,800 child-days, which lasts 480 children 10 days.

From: Deputy Director Past Paper 2008 Solved (2008) · FPSC

Q 51 Mathematics Work and time

A car washer can wash 8 cars in 18 minute; he can wash how many cars in 3 hours?

A

70

B

80

Correct
C

85

D

90

View answer & explanation Ans: 80

Correct Answer: 80

At 8 cars in 18 minutes, the washer washes 80 cars in 180 minutes.

From: Public Relations Officer Past Paper 2007 Solved (2007) · FPSC

Q 52 Mathematics Work and time

10 men can complete a job in 14 days. How long will it take 4 men to finish the same job if they work at the same rate?

A

33 days

B

35 days

Correct
C

37 days

D

39 days

View answer & explanation Ans: 35 days

Correct Answer: 35 days

Ten men in 14 days is 140 man-days, so 4 men take 140 divided by 4, which is 35 days.

From: Inspector ASF Past Paper 2004 Solved (2004) · FPSC

Q 53 Mathematics Work and time

A can do a piece of work in 10 days and B can do it in 15 days. The number of days required by them to finish it, working together is:

A

8

B

7

C

6

Correct
D

4

View answer & explanation Ans: 6

Correct Answer: 6

Working together, A and B finish in 1 divided by (1/10 plus 1/15), which is 6 days.

From: Inspector ASF Past Paper 2004 Solved (2004) · FPSC

Q 54 Mathematics Work and time

16 men build a house in 10 days. How much time will it take 8 men to do this work?

A

25 days

B

20 days

Correct
C

30 days

D

32 days

View answer & explanation Ans: 20 days

Correct Answer: 20 days

Sixteen men in 10 days is 160 man-days, so 8 men take 160 divided by 8, which is 20 days.

From: Inspector ASF Past Paper 2004 Solved (2004) · FPSC

Q 55 Mathematics Work and time

20 men can construct a building in 40 days. How long will it take 10 men to do this work?

A

50 days

B

60 days

C

70 days

D

80 days

Correct
View answer & explanation Ans: 80 days

Correct Answer: 80 days

Twenty men in 40 days is 800 man-days, so 10 men take 800 divided by 10, which is 80 days.

From: Inspector ASF Past Paper 2004 Solved (2004) · FPSC

Q 56 Mathematics Work and time

If 4 men or 7 boys can do a work in 29 days then 12 men and 8 boys will do the same work in?

A

9 days

B

8 days

C

7 days

Correct
D

10 days

View answer & explanation Ans: 7 days

Correct Answer: 7 days

The work is 116 man-days; twelve men plus eight boys equal about 16.6 men, taking 116/16.6 = 7 days.

From: Assistant Director, Establishment Division Past Paper 2001 Solved (2001) · FPSC

Q 57 Mathematics Work and time

Four workers can do a job in 48 days. How long will it take 3 workers to finish the same job.

A

192 days

B

63 days

C

64 days

D

62 days

Correct
View answer & explanation Ans: 62 days

Correct Answer: 62 days

Four workers take 48 days, so the job is 192 worker-days, and 3 workers take 192 / 3 = 64 days.

From: Patrol Officer Motorways Police Past Paper Solved · FPSC

Frequently asked questions

How many Work and time MCQs are there on GK360?

The bank holds 61 questions tagged "Work and time" under Mathematics, drawn from 42 solved papers (2001–2027). After merging the same question asked in multiple papers, 57 are distinct; this page shows the top 57.

Which papers do these Work and time questions come from?

They are pulled from the solved papers in the GK360 archive — CSS, PPSC, FPSC papers among them — and every card on this page names its source paper and year, so you can open the full paper from the Past Papers archive.

Are the answers explained?

Yes — 57 of the 57 questions shown carry a written explanation under the answer; the rest show the verified correct answer for revision. Every answer passed GK360's three-way check (printed key, worked material, standard fact).

How should I prepare Work and time for one-paper exams?

Work through the questions on this page first, note the ones you miss, then attempt the same topic under a timer with the "Practice this topic" button above — it starts a timed Quiz Builder attempt on this exact subject and topic right away.

Explore GK360

Quick links for exam preparation

Use these important GK360 sections to prepare for PPSC, FPSC, one paper exams, subject-wise MCQs, solved past papers and current affairs.